 |
 |
|
In order to view these documents, you will need to have the Adobe Acrobat Reader plug-in installed. You can download Acrobat Reader for free by clicking on the icon to the right. | | Capital Project Title | Capital Project # | Capital Project Price | | Crossing System for Temporary Hoses | 2002-106 | $29,100 | | Mezzanine for Carpenters Shop | 2002-108 | $9,700 | | Mezzanine for Storage Barn | 2002-110 | $26,675 | | Subsite Tracing Machine | 2002-123 | $6,062 | | RD400 Locating Equipment | 2002-147 | $13,338 | | Acton Main (B-job) | 2002-202 | $795,000 | | SWF Well Line Throttle Valves | 2002-214 | $102,000 | | WR Increase Well Water | 2002-216 | $560,000 | | TWM Generator Automatic Control | 2002-217 | $72,750 | | Zionsville Booster Station | 2002-223 | $60,625 | | Update 1985 Water Resource Plan | 2002-224 | $185,000 | | Water Supply to MCRWC (CANCELLED) | 2002-225 | $9,226 | | FC Well #11 Upgrade | 2002-227 | $60,500 | | WR Chemical Conversion | 2002-233 | $4,220,000 | | FC Electrical Upgrade | 2002-243 | $1,333,700 | | NPDES Outfalls | 2002-245 | $101,400 | | WR Basin Flow Meters | 2002-247 | $110,500 | | WR Upgrade 2 Filters per Year | 2002-248 | $577,700 | | Geist Dam Radio-controlled Operator | 2002-250 | $38,800 | | WR Washwater Pump | 2002-254 | $86,100 | | RS Well line Throttle Valve | 2002-260 | $27,000 | | FC Well #17 Check Valve | 2002-260-02 | $7,200 | | WR Transformers | 2002-263 | $100,000 | | Phone Switch | 2002-871 | $298,037 | | FC Washwater Pump Motor Starter | 2002-287 | $14,550 | | WRN Chlorine Contact Basin | 2002-290 | $120,000 | | 300North Lightning Protection | 2002-404 | $12,200 | | FC Basin Chains & Sprockets | 2002-405 | $24,250 | | Geist SS Impellers | 2002-406 | $8,487 | | Morse Service Building Roof Replacement | 2002-408 | $9,700 | | TWM Flock Drive Replacement | 2002-409 | $26,675 | | WR Basin Chains & Sprockets | 2002-410-A | $30,313 | | WR 84MG Floor Tile Replacement | 2002-410-B | $8,488 | | WR Intake Doors | 2002-410-C | $7,275 | | WR Elevator Upgrade | 2002-410-D | $29,100 | | WR Underground Power Feed Replacement | 2002-410-E | $30,000 | | WR 84MG Plant Ceiling | 2002-410-F | $121,250 | | WR Junction Vault Design | 2002-410-G | $30,312 | | WRN Emergency Power | 2002-411-08 | $36,375 | | WRN Filter Valve Controller | 2002-411-09 | $14,550 | | 86th St. & I-465 (B-job) | 2002-B-02-004 | $75,055 | | 56th St. Reed Road to I-465 (B-Job) | 2002-B-02-005 | $161,142 | | 30th St. & Lafayette Rd.(C-job) | 2002-C-02-011 | $337,018 | | Eagle Creek Park Main Ext. | 2002-D-02-272 | $43,796 | | GO Boiler Replacement | 2002-E-01 | $97,960 | | WR Filter # 7 | 2002-E-02 | $116,715 | | Rocky Ripple (K-job) | 2002-K-01-078 | $3,200,000 | | Ravenswood (K-job) | 2002-K-02-032 | $2,205,932 | | McFarland Road at Montgomery Ave | 2002-202A-B-02-001 | $19,000 | | 11th St. at Edgewood Dr. | 2002-202A-B-02-002 | $17,500 | | Combs Road South of Silverado | 2002-202A-B-02-003 | $18,500 | | Franklin Road & 42nd St | 2002-202A-B-02-008 | $20,000 | | Hayworth Road | 2002-203-E-02-013 | $36,000 | | 116th St. Sand Creek Drive to Hoosier Road | 2002-203-E-02-024 | $70,000 | | Springmill Road Bridges north of 116th St. | 2002-203-E-01-005 | $85,000 | | Brisbane & Manning Barrett Law Relocations | 2002-203-E-01-023 | $40,818 | | 96th St. $ Shelbourne Hydrant Location | 2002-203-E-02-049 | $5,012 | | 116th St. and Brooks School Road | 2002-203-E-02-038 | $20,815 | | 24th St. & Talbot | 2002-203-E-02-030 | $8,207 | | McFarland Road at Wetnight Ditch | 2002-203-E-02-027 | $44,059 | | Allisonville Road Bridge 12100N | 2002-203-E-02-008 | $39,938 | | 113th St. & Florida Road | 2002-204-G-02-005 | $325,000 | | Walcott Street | 2002-204-G-02-006 | $7,000 | | Graham Road | 2002-204-G-02-003 | $4,000 | | 56th St: west of I-65 | 2002-204-G-02-004 | $3,500 | | Butler Ave& 70th St. | 2002-204-G-02-008 | $6,200 | | Camby Road | 2002-206-I-02-001 | $15,000 | | US 421 Phase 1: 96th St. to 106th St. | 2002-210-F-01-002 | $50,000 | | W. Washington St: Raceway Rd. to Research Way | 2002-210-F-00-002 | $70,000 | | CSX Bridge over US 136 | 2002-210-F-01-003 | $44,263 | | Tribley Court-HWC | 2002-213-C-02-001 | $30,312 | | Yellowood Circle-HWC | 2002-213-C-02-002 | $33,950 | | Amhurst Circle-HWC | 2002-213-C-02-003 | $30,312 | | Sassafras Circle-HWC | 2002-213-C-02-004 | $30,312 | | 21st St: Rockford St.to German Church Road | 2002-213-C-02-006 | $205,000 | | Gladstone Ave: 30th St to RR | 2002-213-C-02-007 | $145,500 | | Massachusetts Ave: Rural St to a pt west | 2002-213-C-02-008 | $54,600 | | Pine St. & 9th St | 2002-213-C-02-012 | $26,885 | | Diamond Pointe | 2002-213-C-02-013 | $18,500 |
|
|
|
|
|
|
|
|
|
|
 |
|
 |
 |