IndyGov
City of Indianapolis
Department of Public Works

 Project Information
 Sidewalk Repairs
 Snow Removal
 Street Closings
 Street Repairs
 Cave-ins
 Potholes
 Resurfacing
 Traffic Signs & Signals

Street Repairs

To report street damage call 327-4MAC (327-4622). The Department of Public Works (DPW) will inspect to determine the required action. If minor repairs are required, the Street Maintenance Section of Public Works will schedule the street for corrective repairs. If the street needs to be resurfaced or reconstructed, DPW will evaluate the street for possible inclusion in a future program.

DPW will use approximately 18,500 tons of asphalt repairs in order to make the streets smoother and safer. In addition, crews expect to grind down or scrape off patching humps in 2007. DPW will place bituminous mixtures to fill potholes, edge failures, and other surface deterioration. When warranted, crews replace the pavement with full depth asphalt. DPW will continue to upgrade its patching capabilities through the purchase of more efficient equipment and materials.

 
 

Last Updated: 5/29/2007 |  Print This Page | Email to Friend

 

Home | Search | Services | Mayor | Council | City | County | Courts

© 1996 - 2008 All Rights Reserved | Privacy Statement | Terms of Use | About this Site