Wayne Township

|
Project: Eagle Creek Dam Improvements (2009) |
Project #: LD-15-018 |
|
Type: Storm |
Secondary Type: Levees/Dams |
Bid/Study Date: 2009 |
|
Township: Pike/Wayne |
Council District: 6 |
Status: Planning |
|
Description: Project consists of routine annual improvements to the Eagle Creek Dam and associated facilities as part of ongoing improvements and maintenance |
|
|
|
|
|
Project: Eagle Creek Dam Improvements - 2008 |
Project #: LD-15-015 |
|
Type: Storm |
Secondary Type: Levees/Dams |
Bid/Study Date: 2008 |
|
Township: Pike/Wayne |
Council District: 6 |
Status: Design |
|
Description: Project will provide miscellaneous upgrades at the dam |
|
|
|
|
|
Project: Eagle Creek Dam Lift Chain Sprocket Modification |
Project #: LD-15-011B |
|
Type: Storm |
Secondary Type: Levees/Dams |
Bid/Study Date: 2008 |
|
Township: Wayne |
Council District: 6 |
Status: Design |
|
Description: Modification to twelve (12) taintor gate lift chain sprockets; alteration required to accommodate new four inch (4") diameter roller chains to meet ASME specifications |
|
|
|
|
|
Project: Biennial High Hazard Dams Inspection 2008-2016 |
Project #: SY-00-150 |
|
Type: Storm |
Secondary Type: Levees/ Dams |
Bid/Study Date: 2008 |
|
Township: Center/Wayne |
Council District: 6, 10 |
Status: Planning |
|
Description: Biennial Eagle Creek Dam & Pogues Run Inspection 2008-2009. Will include 1 in-depth and 2 short form inspections |
|
|
|
|
|
Project: Eagle Creek Dam Improvements 2007 |
Project #: LD-15-013 |
|
Type: Storm |
Secondary Type: Levees/Dams |
Bid/Study Date: 2008 |
|
Township: Pike/Wayne |
Council District: 6 |
Status: Design |
|
Description: Annual Improvements to Eagle Creek Dam including bank stabilization; project is being performed under the CBBEL on-call |
|
|
|
|
|
Project: INFDRP Lake Sullivan Environmental Mitigation |
Project #: LD-17-002 |
|
Type: Storm |
Secondary Type: Levees/ Dams- Fed Aid |
Bid/Study Date: 2008 |
|
Township: Center/Wayne |
Council District: 8 |
Status: Design |
|
Description: Environmental mitigation project required by IDNR Permit FW-19540 for the construction of the INFDRP, LD-11-084 flood works |
|
|
|
|
|
Project: Mars Hill - Phase II |
Project #: SD-30-064B |
|
Type: Storm |
Secondary Type: Roadside/Area Drainage |
Bid/Study Date: 2008 |
|
Township: Wayne |
Council District: 19 |
Status: Design |
|
Description: Drainage improvements, storm sewer installation - Phase II |
|
|
|
|
|
Project: Eagle Creek Interceptor-Facility Planning (PER 04B) |
Project #: CS-31-007A |
|
Type: Sanitary |
Secondary Type: CSO |
Bid/Study Date: 2007 |
|
Township: Center/Wayne |
Council District: 14, 19 |
Status: Planning |
|
Description: Project allocates funds toward the facility planning for Eagle Creek Interceptor, will provide a collection interceptor that conveys CSO flows to the Belmont AWT facility |
|
|
|
|
|
Project: Belmont North Parallel Interceptor - Design (PER 5B) |
Project #: SS-24-001B |
|
Type: Sanitary |
Secondary Type: Sanitary Sewers |
Bid/Study Date: 2007 |
|
Township: Pike/Washington/Wayne |
Council District: 1, 2, 8, 15 |
Status: Design |
|
Description: Design of a new parallel interceptor along the existing Belmont North Interceptor |
|
|
|
|
|
|
Project: Eagle Creek Dam - Electric Upgrades |
Project #: LD-15-016 |
|
Type: Storm |
Secondary Type: Levees/Dams |
Bid/Study Date: 2007 |
|
Township: Center/Pike/Wayne |
Council District: 6 |
Status: Construction |
|
Description: Significant upgrades to the existing original electric at Eagle Creek Dam |
|
|
|
|
|
Project: Eagle Creek Dam Chain Replacement |
Project #: LD-15-011A |
|
Type: Storm |
Secondary Type: Levees/Dams |
Bid/Study Date: 2007 |
|
Township: Wayne |
Council District: 6 |
Status: Construction |
|
Description: Replace chains on gates at Eagle Creek Dam |
|
|
|
|
|
Project: Mars Hill Drainage Improvements - Phase III |
Project #: SD-30-064C |
|
Type: Storm |
Secondary Type: Roadside/Area Drainage |
Bid/Study Date: 2007 |
|
Township: Decatur/Wayne |
Council District: 19 |
Status: Construction |
|
Description: Phase III Drainage Improvements in conjunction with resurfacing work |
|
|
|
|
|
Project: SSO 113 Elimination Project (PER-4B) |
Project #: SS-22-013 |
|
Type: Sanitary |
Secondary Type: Sanitary Sewers |
Bid/Study Date: 2006 |
|
Township: Wayne |
Council District: 6 |
Status: Close-out |
|
Description: Extend the force main from Lift Station 115 to discharge into a higher capacity Bridgeport Interceptor near 10th Street, thereby eliminating SSO 113 |
|
|
|
|
|
Project: High Hazard Dams Emergency Action Plan |
Project #: SY-00-200 |
|
Type: Storm |
Secondary Type: Levees/Dams |
Bid/Study Date: 2006 |
|
Township: Center/Warren |
Council District: 6, 10 |
| | |