 Belmont-Southport Interplant Connect
 Fall Creek White River Tunnel
 Information for Consultants
 Project Fact Sheets

Wayne Township

 

 

Project:  Eagle Creek Dam Improvements (2009)

Project #:  LD-15-018

Type:  Storm

Secondary Type:  Levees/Dams

Bid/Study Date:  2009  

Township:  Pike/Wayne

Council District:  6

Status:  Planning

Description:  Project consists of routine annual improvements to the Eagle Creek Dam and associated facilities as part of ongoing improvements and maintenance

 

Project:  Eagle Creek Dam Improvements - 2008

Project #:  LD-15-015

Type:  Storm

Secondary Type:  Levees/Dams

Bid/Study Date: 2008

Township:  Pike/Wayne

Council District:  6

Status:  Design

Description:  Project will provide miscellaneous upgrades at the dam

 

Project:  Eagle Creek Dam Lift Chain Sprocket Modification

Project #:  LD-15-011B

Type:  Storm

Secondary Type:  Levees/Dams

Bid/Study Date:  2008

Township:  Wayne

Council District:  6

Status:  Design

Description:  Modification to twelve (12) taintor gate lift chain sprockets;  alteration required to accommodate new four inch (4") diameter roller chains to meet ASME specifications

 

Project:  Biennial High Hazard Dams Inspection 2008-2016

Project #:  SY-00-150

Type:  Storm

Secondary Type:  Levees/ Dams

Bid/Study Date:  2008

Township:  Center/Wayne

Council District:  6, 10

Status:  Planning

Description:  Biennial Eagle Creek Dam & Pogues Run Inspection 2008-2009.  Will include 1 in-depth and 2 short form inspections

 

Project:  Eagle Creek Dam Improvements 2007

Project #:  LD-15-013

Type:  Storm

Secondary Type:  Levees/Dams

Bid/Study Date:  2008

Township:  Pike/Wayne

Council District:  6

Status:  Design

Description:  Annual Improvements to Eagle Creek Dam including bank stabilization; project is being performed under the CBBEL on-call

 

Project:  INFDRP Lake Sullivan Environmental Mitigation

Project #:  LD-17-002

Type:  Storm

Secondary Type:  Levees/ Dams- Fed Aid

Bid/Study Date:  2008

Township:  Center/Wayne

Council District:  8

Status:  Design

Description:  Environmental mitigation project required by IDNR Permit FW-19540 for the construction of the INFDRP, LD-11-084 flood works

 

Project:  Mars Hill - Phase II

Project #:  SD-30-064B

Type:  Storm

Secondary Type:  Roadside/Area Drainage

Bid/Study Date:  2008

Township:  Wayne

Council District:  19

Status:  Design

Description:  Drainage improvements, storm sewer installation - Phase II

 

Project:  Eagle Creek Interceptor-Facility Planning (PER 04B)

Project #:  CS-31-007A

Type:  Sanitary

Secondary Type:  CSO

Bid/Study Date:  2007

Township:  Center/Wayne

Council District:  14, 19

Status:  Planning

Description:  Project allocates funds toward the facility planning for Eagle Creek Interceptor, will provide a collection interceptor that conveys CSO flows to the Belmont AWT facility

 

Project:  Belmont North Parallel Interceptor - Design (PER 5B)

Project #:  SS-24-001B

Type:  Sanitary

Secondary Type:  Sanitary Sewers

Bid/Study Date:  2007

Township:  Pike/Washington/Wayne

Council District:  1, 2, 8, 15

Status:  Design

Description:  Design of a new parallel interceptor along the existing Belmont North Interceptor

 

Project:  Eagle Creek Dam - Electric Upgrades

Project #:  LD-15-016

Type:  Storm

Secondary Type:  Levees/Dams

Bid/Study Date:  2007

Township:  Center/Pike/Wayne

Council District:  6

Status:  Construction

Description:  Significant upgrades to the existing original electric at Eagle Creek Dam

 

Project:  Eagle Creek Dam Chain Replacement

Project #:  LD-15-011A

Type:  Storm

Secondary Type:  Levees/Dams

Bid/Study Date:  2007

Township:  Wayne

Council District:  6

Status:  Construction

Description:  Replace chains on gates at Eagle Creek Dam

 

Project:  Mars Hill Drainage Improvements - Phase III

Project #:  SD-30-064C

Type:  Storm

Secondary Type:  Roadside/Area Drainage

Bid/Study Date: 2007

Township:  Decatur/Wayne

Council District:  19

Status:  Construction

Description:  Phase III Drainage Improvements in conjunction with resurfacing work

 

Project:  SSO 113 Elimination Project (PER-4B)

Project #:  SS-22-013

Type:  Sanitary

Secondary Type:  Sanitary Sewers

Bid/Study Date:  2006

Township:  Wayne

Council District:  6

Status:  Close-out

Description:  Extend the force main from Lift Station 115 to discharge into a higher capacity Bridgeport Interceptor near 10th Street, thereby eliminating SSO 113

 

Project:  High Hazard Dams Emergency Action Plan

Project #:  SY-00-200

Type:  Storm

Secondary Type:  Levees/Dams

Bid/Study Date:  2006

Township:  Center/Warren

Council District:  6, 10