Project:  59th/Grandview Septic Tank Elimination Project  (PER 5B)

Project #:  BL-10-069A

Type:  Sanitary

Secondary Type:  STEP

Bid/Study Date: 2012

Township:  Washington

Council District:  8

Status:  Design

Description:  STEP Sanitary Sewer Project; Grandview Phase 2 of 2

 

Project:  63rd/Spring Mill Septic Tank Elimination Project (PER 5B)

Project #:  BL-10-069B

Type:  Sanitary

Secondary Type:  STEP

Bid/Study Date:  2012

Township:  Washington

Council District: 2, 8

Status:  Design

Description:  STEP sewer extension; Grandview Phase 2 of 2

 

Project:  59th/Grandview Neighborhood Area Stormwater Improvements

Project #:  SD-10-017

Type:  Storm

Secondary Type:  Roadside/Area Drainage

Bid/Study Date:  2012

Township:  Washington

Council District:  8

Status:  Design

Description:  Neighborhood stormwater improvements as a component of BL-10-069A, 59th/Grandview STEP Project

 

Project:  Fox Hill/Hoover Septic Tank Elimination Project (PER 5B)

Project #:  BL-10-069D

Type:  Sanitary

Secondary Type:  STEP

Bid/Study Date:  2010

Township:  Washington

Council District:  8

Status:  Design

Description:  STEP Sanitary Sewer in the area of Fox Hill and Hoover Rd.; Grandview Phase 2 of 2

 

Project:  Sunset/Kessler Septic Tank Elimination Project (PER 5B)

Project #:  BL-10-069E

Type:  Sanitary

Secondary Type:  STEP

Bid/Study Date:  2009

Township:  Washington

Council District: 

Status: 

Description:  STEP sanitary sewer extension; Grandview Phase 2 of 2

 

Project:  Large Diameter Combined Sewer Rehabilitation - Westfield Blvd. and others

Project #:  CS-11-012

Type:  Sanitary

Secondary Type:  CSO

Bid/Study Date:  2008

Township:  Washington

Council District:  8

Status:  Purchasing

Description:  Rehabilitation of combined sewers upstream of CSO 205

 

Project:  Belmont North Parallel Interceptor - Construction Phase 1

Project #:  SS-24-001C

Type:  Sanitary

Secondary Type:  Sanitary Sewers

Bid/Study Date:  2008

Township:  Washington

Council District:  1, 2, 8

Status:  Design

Description:  Construction of the Belmont North Parallel interceptor

 

Project:  Indianapolis North Flood Damage Reduction Project, Phase IIIB (FY 2009)

Project #:  LD-11-084J

Type:  Storm

Secondary Type: 

Levees/Dams- Fed Aid

Bid/Study Date:  2008 

Township:  Washington

Council District:  8

Status:  Planning

Description:  Continuation of the construction phase of the South Warfleigh/Canal Towpath segment of Phase IIIB

 

Project:  INFDRP Lake Sullivan Environmental Mitigation

Project #:  LD-17-002

Type:  Storm

Secondary Type:  Levees/ Dams- Fed Aid

Bid/Study Date:  2008

Township:  Center/Wayne

Council District:  8

Status:  Design

Description:  Environmental mitigation project required by IDNR Permit FW-19540 for the construction of the INFDRP, LD-11-084 flood works

 

Project:  Kessler Blvd. Stormwater Improvements

Project #:  SD-10-017A

Type:  Storm

Secondary Type:  Roadside/Area Drainage

Bid/Study Date: 2008

Township:  Washington

Council District:  8

Status:  Design

Description:  Installing Storm sewers along Kessler Blvd and 57th St. from Lieber Rd. to Crooked Creek

 

Project:  Belmont North Parallel Interceptor - Design (PER 5B)

Project #:  SS-24-001B

Type:  Sanitary

Secondary Type:  Sanitary Sewers

Bid/Study Date:  2007

Township:  Pike/Washington/Wayne

Council District:  1, 2, 8, 15

Status:  Design

Description:  Design of a new parallel interceptor along the existing Belmont North Interceptor

 

Project:  LDSR Pennsylvania Street & Other Locations (PER 5B)

Project #:  CS-00-026

Type:  Sanitary

Secondary Type:  Sanitary Sewers-Rehab

Bid/Study Date:  2007

Township:  Systemwide

Council District:  8, 15

Status:  Construction

Description:  Sewer rehabilitation based upon the Greeley and Hansen report

 

Project:  Belmont North I/I Reduction Phase 2 (PER 4A)

Project #:  SS-24-001F

Type:  Sanitary

Secondary Type:  Sanitary Sewers-Rehab

Bid/Study Date:  2007

Township:  Pike/Washington

Council District:  1, 2, 8

Status:  Close-out

Description:  Includes CIPP lining and pipe bursting for improvements in portions of Belmont North Interceptor system based on SSES - Belmont North Capacity Management Project

 

Project:  Basin 19 Rehabilitation (PER 04B)

Project #:  SS-11-082

Type:  Sanitary

Secondary Type:  Sanitary Sewers-Rehab

Bid/Study Date:  2006