Council District 3 Projects

|
Project: Castleton Relief Sewer (PER5B) |
Project #: SS-06-006 |
|
Type: Sanitary |
Secondary Type: Sanitary Sewers |
Bid/Study Date: 2010 |
|
Township: Washington |
Council District: 3, 4 |
Status: Planning |
|
Description: Update design plans and start construction |
|
|
|
|
|
Project: Norwaldo Phase II Stormwater Improvements |
Project #: SD-18-003B |
|
Type: Storm |
Secondary Type: Roadside/Area Drainage |
Bid/Study Date: 2009 |
|
Township: Washington |
Council District: 3 |
Status: Planning |
|
Description: Neighborhood drainage improvements in the Northdale-Maple Lawn neighborhoods as follow-up projects to SD-18-003, Norwaldo / Ralston / Kingsley Drainage Improvement Project |
|
|
|
|
|
Project: Lift Station 507 Upgrade - Design |
Project #: CS-11-088A |
|
Type: Sanitary |
Secondary Type: CSO |
Bid/Study Date: 2008 |
|
Township: Washington |
Council District: 3 |
Status: Planning |
|
Description: Upgrades to LS 507 to provide additional storage and disinfection capability |
|
Project: Lift Station 504 Upgrade (PER-04B) |
Project #: LS-11-002 |
|
Type: Sanitary |
Secondary Type: Lift Stations |
Bid/Study Date: 2007 |
|
Township: Washington |
Council District: 3 |
Status: Construction |
|
Description: Elimination of extended shafts, installation of dry-pit submersibles and electrical upgrades |
|
|
|
|
|
Project: Siphon at 71st St./ Williams Creek |
Project #: SI-11-088 |
|
Type: Sanitary |
Secondary Type: Sanitary Sewers-Rehab |
Bid/Study Date: 2007 |
|
Township: Washington |
Council District: 3 |
Status: Close-out |
|
Description: Repairs and upgrades to the siphon located at 71st Street and Williams Creek |
|
|
|
|
|
Project: Indianapolis North Flood Damage Reduction Project, Phase IIIA Retrofit |
Project #: LD-11-084K |
|
Type: Storm |
Secondary Type: Levees/Dams – Fed Aid |
Bid/Study Date: 2007 |
|
Township: Washington |
Council District: 3 |
Status: Design |
|
Description: Structural retrofit of the Warfleigh Levee to comply with revised Federal design criteria resulting from Hurricane Katrina. |
|
|
|
|
|
Project: Basin 19 Rehabilitation (PER 04B) |
Project #: SS-11-082 |
|
Type: Sanitary |
Secondary Type: Sanitary Sewers-Rehab |
Bid/Study Date: 2006 |
|
Township: Washington |
Council District: 3, 8, 9, 15 |
Status: Close-out |
|
Description: project will perform various rehabs in accordance with Inflow/Infiltration (I/I) evaluations; will correct system failures, reduce clear water I/I into the system, increase system capacity and reduce operation and maintenance costs |
|
|
|
|
|
Project: INFDRP, Phase IIIC, North Keystone Relief Storm Sewer Gate Rehab (FY 2006) |
Project #: LD-11-084I |
|
Type: Storm |
Secondary Type: Levees/Dams |
Bid/Study Date: 2006 |
|
Township: Washington |
Council District: 3 |
Status: Construction |
|
Description: Rehabilitation/reconstruction of the outfall gate structure of the North Keystone Relief Storm Sewer system as a component of the INFDRP Monon-Broad Ripple segment |
|
|
|
|
|
Project: Indianapolis North Flood Damage Reduction Project, Phase IIIC (FY 2007) |
Project #: LD-11-084G |
|
Type: Storm |
Secondary Type: Levees/Dams – Fed Aid |
Bid/Study Date: 2006 |
|
Township: Washington |
Council District: 3 |
Status: Construction |
|
Description: Continuation of the construction phase of the Monon/Broad Ripple segment of Phase IIIC |
|
|
|
|
|
Project: Retrofit Detention Basin per NPDES Permit for 2003 - PH II |
Project #: LD-00-009B |
|
Type: Storm |
Secondary Type: Water Quality |
Bid/Study Date: 2006 |
|
Township: Washington/Wayne |
Council District: 3, 13 |
Status: Construction |
|
Description: Project entails Retrofit Detention Basin Per NPDES Permit for Holly Creek and Farley Creek |
|
|