Fall Creek Evaluation Study
September 2005
Volume 1
Table of Contents
Executive Summary
Section 1 Introduction
Section 2 Regional Geology and Hydrogeology
Section 3 Fall Creek-White River Tunnel
Section 4 Deep Tunnel Pump Station
Section 5 Consolidation Sewers
Section 6 Connection Tunnels
Section 7 Construction Considerations
Section 8 Project Considerations
Section 9 Risk Management
Section 10 Geotechnical Exploration Program
Section 11 Belmont AWT Effluent Pump Station
Section 12 Force Main Alternatives
Section 13 Outfall Structures
Section 14 Opinion of Probable Costs
Section 15 Decision Screening
Section 16 Project Schedule
Section 17 Conclusions and Recommendations
Figures
Figure ES.1 Figure ES.6 Figure ES.7 Figure 1.1 Figure 2.1 Figure 2.2 Figure 2.3 Figure 2.4 Figure 2.5 Figure 2.6 Figure 2.7 Figure 3.1 Figure 3.2 Figure 3.3 Figure 3.4 Figure 3.5 Figure 4.1 Figure 4.2 Figure 5.1 Figure 5.2 Figure 5.3 Figure 5.4 Figure 10.1 Figure 11.1 Figure 11.2 Figure 11.3 Figure 11.5 Figure 11.6 Figure 11.7 Figure 12.1 Figure 12.2 Figure 12.3 Figure 12.4 Figure 12.5 Figure 12.6 Figure 13.1 Figure 13.2 Figure 13.3 Figure 13.4 Figure 13.5 Figure 13.6 Figure 13.7 Figure 13.8 Figure 13.9 Figure 13.10 Figure 13.11
Volume 2
Appendix A Documents Reviewed
Appendix B Geological and Hydrogeological Data
Appendix C Consolidation Sewer and Drop Shaft Location Plans
Appendix D Phase I Environmental Assessment Site Report
Appendix E Property Owners Easement Requirements for Main Tunnel
Appendix F Indianapolis Water Top 100 Usage Customers
Appendix G Preliminary Force Main Alignments Index
Appendix H Preliminary Opinion of Probable Costs
Appendix J Decision Screening Process
Appendix K Preliminary Tunnel Alignment
Appendix L Indianapolis Parks Greenways' Recommendation Proposal
|