IndyGov
Department of Public Works, City of Indianapolis
Clean Stream Team

 Plans
 Sanitary District Standards
 Studies and Research
 Capacity Management, Operation and Maintenance Program
 Consent Decree
 Fall Creek Evaluation Study
 Fall Creek/White River Tunnel Groundwater Management Plan
 NPDES Stormwater Permit Annual Report
 Raw Sewage Overflow Long Term Control Plan
 Six Month Status Report
 Use Attainability Analysis
 Wasteload Allocation Report

Fall Creek Evaluation Study

September 2005

Volume 1

Table of Contents

Executive Summary

Section 1 Introduction

Section 2 Regional Geology and Hydrogeology

Section 3 Fall Creek-White River Tunnel

Section 4 Deep Tunnel Pump Station

Section 5 Consolidation Sewers

Section 6 Connection Tunnels

Section 7 Construction Considerations

Section 8 Project Considerations

Section 9 Risk Management

Section 10 Geotechnical Exploration Program

Section 11 Belmont AWT Effluent Pump Station

Section 12 Force Main Alternatives

Section 13 Outfall Structures

Section 14 Opinion of Probable Costs

Section 15 Decision Screening

Section 16 Project Schedule

Section 17 Conclusions and Recommendations

Figures

Figure ES.1
Figure ES.6
Figure ES.7
Figure 1.1
Figure 2.1
Figure 2.2
Figure 2.3
Figure 2.4
Figure 2.5
Figure 2.6
Figure 2.7
Figure 3.1
Figure 3.2
Figure 3.3
Figure 3.4
Figure 3.5
Figure 4.1
Figure 4.2
Figure 5.1
Figure 5.2
Figure 5.3
Figure 5.4
Figure 10.1
Figure 11.1
Figure 11.2
Figure 11.3
Figure 11.5
Figure 11.6
Figure 11.7
Figure 12.1
Figure 12.2
Figure 12.3
Figure 12.4
Figure 12.5
Figure 12.6
Figure 13.1
Figure 13.2
Figure 13.3
Figure 13.4
Figure 13.5
Figure 13.6
Figure 13.7
Figure 13.8
Figure 13.9
Figure 13.10
Figure 13.11

Volume 2

Appendix A Documents Reviewed

Appendix B Geological and Hydrogeological Data

Appendix C Consolidation Sewer and Drop Shaft Location Plans
Figures C1 to C4 Figures C5 to C7 Figures C8 to C12
Figures C13 to C13D Figures C14 to C17 Figures C18 to C22

Appendix D Phase I Environmental Assessment Site Report

Appendix E Property Owners Easement Requirements for Main Tunnel

Appendix F Indianapolis Water Top 100 Usage Customers

Appendix G Preliminary Force Main Alignments
     Index
A01  A02  A03  A04  A05  A06
A07  A08  A09  A10  A11  A12
A13  A14  A15  A16  A17  A18
A19  A20  A21  A22

B01  B02  B03  B04  B05  B06
B07  B08  B09  B10  B11  B12

Appendix H Preliminary Opinion of Probable Costs

Appendix J Decision Screening Process

Appendix K Preliminary Tunnel Alignment

K-1  K-2  K-3
K-4  K-5  K-6

Appendix L Indianapolis Parks Greenways' Recommendation Proposal

 
 

Last Updated: 5/16/2007 |  Print This Page | Email to Friend

 

Home | Search | Services | Mayor | Council | City | County | Courts

© 1996 - 2008 All Rights Reserved | Privacy Statement | Terms of Use | About this Site