IndyGov
Department of Metropolitan Development, City of Indianapolis
Division of Compliance

 Driveways & Curb Cuts
 Electrical
 Heating & Cooling
 Improvement Location
 Master
 Plumbing
 Residential Parking
 Right of Way
 Encroachment License
 Excavations
 Oversize Load
 Use With No Excavations
 Utility Use Permit Decals
 Sewer Lateral Connection
 Signs
 Structural
 Wrecking
 Certificate of Appropriateness
 Drainage
 Fees
 File a Permit Online
 Permit Forms
 Special Events

Oversize Load

This is a Right of Way Use permit.  The application is unique to this type of permit, requiring a separate form.  This permit is required whenever a request is made to transport an oversize or overweight load inside the City of Indianapolis.  These requests are typically made by out of state trucking firms wishing to deliver heavy machinery, factory equipment, etc., inside the city.  The boundaries for a permit requirement is any area inside the I-465 beltway.  The application form requires a notarized signature by the applicant before being considered.  If the load being transported exceeds 150,000 pounds, additional authorization must be obtained before the permit is issued. 

Oversize Load Requirements

 
 

Last Updated: 5/23/2007 |  Print This Page | Email to Friend

 

Home | Search | Services | Mayor | Council | City | County | Courts

© 1996 - 2008 All Rights Reserved | Privacy Statement | Terms of Use | About this Site